Nasa to launch moon rocket on Aug 29

Published
2
Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks -- longer than any ship for astronauts has done without docking, before returning home faster and hotter than ever before. — AFP
Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks -- longer than any ship for astronauts has done without docking, before returning home faster and hotter than ever before. — AFP

WASHINGTON: Mark your calendars: Nasa’s Artemis programme to return to the Moon could launch its first uncrewed test flight as soon as August 29, the agency said on Wednesday.

Artemis-1 is the first in a series of missions as the United States seeks to return humans to the Moon, build a sustained presence there, and use the lessons gained to plan a trip to Mars sometime in the 2030s.

Nasa associate administrator Jim Free told reporters the first window of possible launch dates for the giant Space Launch System (SLS) and Orion crew capsule were August 29, September 2, and September 5.

The decision follows final checks on the ground at the Kennedy Space Center in Florida known as “wet dress rehearsals.” The last of these tests, carried out in June, met 90 percent of the team’s goals, and on Wednesday Cliff Lanham, senior vehicle operations manager, said engineers have now replaced faulty seals that had caused a hydrogen leak on SLS during the final trial.

Artemis-1 is set to journey around the far side of the Moon in a mission lasting four to six weeks — longer than any ship for astronauts has done without docking, before returning home faster and hotter than every vessel before.

It will also deploy a number of small satellites called CubeSats to perform experiments in space.

Artemis mission manager Mike Sarafin told reporters: “Our first and our primary objective is to demonstrate Orion’s heat shield in lunar reentry conditions.” When the capsule returns from the Moon, it will be traveling about 24,500 miles an hour (39,400 kilometers per hour) and experience temperatures half as hot as the Sun outside its heat shield.

The second objective is to demonstrate the flight worthiness of the rocket and crew capsule as they perform all their maneuvers over the course of the mission.

Finally, Nasa will look to successfully retrieve Orion after splashdown, and thoroughly inspect it.

Artemis-2 will be the first crewed test, flying around the Moon but not landing, while Artemis-3 will see the first woman and first person of color touch down on the lunar south pole.

Published in Dawn, July 21st, 2022

Opinion

Editorial

Fixing bond markets
Updated 01 Oct, 2026

Fixing bond markets

Pension funds, insurance companies, mutual funds, retail investors, and eventually, foreign investors must become bigger participants in the market.
Call centre rackets
01 Oct, 2026

Call centre rackets

A NUMBER of recent raids conducted by the authorities in different cities point to the growing threat fraudulent ...
Homeward bound
01 Oct, 2026

Homeward bound

FIVE months after Somali pirates captured an oil tanker carrying a 19-member multinational crew, Somali maritime...
Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...