No gas for industry, CNG and cement sectors in Punjab, KP, other areas from Sept 13-15

Published
4
Gas supply to the general industry and its captive power (non-export), compressed natural gas and cement sectors will remain suspended for three days in Punjab, Khyber Pakhtunkhwa and other areas. — Reuters/File
Gas supply to the general industry and its captive power (non-export), compressed natural gas and cement sectors will remain suspended for three days in Punjab, Khyber Pakhtunkhwa and other areas. — Reuters/File

LAHORE: Gas supply to the general industry and its captive power (non-export), compressed natural gas (CNG) and cement sectors will remain suspended for three days in Punjab, Khyber Pakhtunkhwa and other areas due to re-deployment of the Floating Storage and Re-gasification Unit (FSRU) at the Karachi port.

“The respective state-owned organisations are not taking interest in resolving issues related to increasing the capacity and overcoming gas shortage over fear from the National Accountability Bureau (NAB). The frequent gas supply suspension either due to shortage, dry-docking of the liquefied petroleum gas (LPG) terminal or the FSRU re-deployment is a result of the inefficiency of these organisations,” All Pakistan CNG Association (APCNGA) group leader Ghayas Piracha told Dawn.

According to a notification issued by the Sui Northern Gas Pipelines Limited (SNGPL) on Friday, the re-gasification from Engro Elengy Terminal Private Limited (LNG terminal-1) shall be disrupted from Sept 13 to 15 due to re-deployment of the FSRU exquisite after dry docking.

“In order to manage the gas load during the said period it is requested to advise all the regions to suspend gas/RLNG supply to CNG, cement, general industry and its captive power (non-export) sectors across the franchised area of SNGPL (including Punjab and KP),” reads the SNGPL notification.

However, the company allowed allocation of 10 per cent gas/ re-gasified liquefied natural gas (RLNG) to the processing industry during the period as per past practice.

The APCNGA leader termed the authorities’ attitude towards resolving the issues surprising.

“It is a clear decision of the Economic Coordination Committee and the cabinet to allow the private sector, including the CNG, to import LNG on their own to meet their demands. But despite the passage of a year, the authorities concerned have not taken action in this regard,” Mr Piracha deplored.

According to an official source, the EETL had three months ago replaced its five-year-old FSRU with a new one with a capacity of 900 million cubic feet of gas per day (MMFCD). Under the agreement with the government, the company was bound to overhaul its unit worth 600MMCFD. Therefore, it decided to buy an FSRU of 900MMCFD instead of overhauling the smaller one. But, due to official bottlenecks, the contract with the government couldn’t be signed.

The source said that when the company faced delays from the government, it decided to overhaul the smaller one and send back the bigger one. “Due to this, the company faced a loss of millions of dollars and the upcoming winter may be tough for all consumers,” he warned.

Published in Dawn, September 11th, 2021

Opinion

Editorial

Fixing bond markets
Updated 01 Oct, 2026

Fixing bond markets

Pension funds, insurance companies, mutual funds, retail investors, and eventually, foreign investors must become bigger participants in the market.
Call centre rackets
01 Oct, 2026

Call centre rackets

A NUMBER of recent raids conducted by the authorities in different cities point to the growing threat fraudulent ...
Homeward bound
01 Oct, 2026

Homeward bound

FIVE months after Somali pirates captured an oil tanker carrying a 19-member multinational crew, Somali maritime...
Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...