Nasa’s giant US moon rocket emerges for debut launch

Published
1
THE Artemis rocket, with Orion spacecraft aboard, is being placed on the launch pad at Nasa’s Kennedy Space Centre in Florida on Wednesday.—AFP
THE Artemis rocket, with Orion spacecraft aboard, is being placed on the launch pad at Nasa’s Kennedy Space Centre in Florida on Wednesday.—AFP

Nasa’s gigantic Space Launch System moon rocket, topped with an uncrewed astronaut capsule, began an hours-long crawl to its launchpad on Tuesday night ahead of the behemoth’s debut test flight this month.

The 322-foot-tall (98-metre) rocket is scheduled to embark on its first mission to space — without any humans — on Aug 29. It will be a crucial, long-delayed demonstration trip to the moon for Nasa’s Artemis programme, the United States’ multibillion- dollar effort to return humans to the lunar surface as practice for future missions to Mars.

The Space Launch System, whose development during the past decade has been led by Boeing Co, emerged from its assembly building at Nasa’s Kennedy Space Centre in Florida about 10pm on Tuesday and began a four-mile (6-kilometre) trek to its launchpad. Moving less than 1mph (1.6kph), the rollout will take roughly 11 hours.

Sitting atop the rocket is Nasa’s Orion astronaut capsule, built by Lockheed Martin Corp. It is designed to separate from the rocket in space, ferry humans towards the moon and rendezvous with a separate spacecraft that will take astronauts to the lunar surface.

For the Aug 29 mission, called Artemis 1, the Orion capsule will launch atop the Space Launch System without any humans and orbit the moon before returning to Earth for an ocean splashdown 42 days later. If bad launch weather or a minor technical issue triggers a delay on Aug. 29, the National Aeronautics and Space Administration has backup launch dates on Sept 2 and Sept 5.

Published in Dawn, August 18th, 2022

Opinion

Editorial

Fixing bond markets
Updated 01 Oct, 2026

Fixing bond markets

Pension funds, insurance companies, mutual funds, retail investors, and eventually, foreign investors must become bigger participants in the market.
Call centre rackets
01 Oct, 2026

Call centre rackets

A NUMBER of recent raids conducted by the authorities in different cities point to the growing threat fraudulent ...
Homeward bound
01 Oct, 2026

Homeward bound

FIVE months after Somali pirates captured an oil tanker carrying a 19-member multinational crew, Somali maritime...
Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...