KARACHI: Sindh government has decided to build a new storm-water drain to combat urban flooding, which has almost become a regular feature in the metropolis during monsoon rains, according to officials.

They said on Thursday the decision was taken at a meeting convened to mull over the measures for protecting vulnerable neighbourhoods in the teeming megacity from flooding.

Officials said the meeting presided over by Sindh Chief Secretary Mumtaz Ali Shah decided to build the new storm-water drain and rehabilitate the existing Mehran drain to save residential areas like Saadi Town and other low-lying areas on the outskirts of the city.

The meeting was informed that monsoon rains in the city itself together with rainwater that flowed down mountains routinely caused flooding every year. During rains, the participants were told, water coming from Lath Dam used to discharge into Malir River through Mehran storm-water drain but the construction of M-9 Motorway, and certain residential projects over the natural route of the rainwater and Karachi Metropolitan Corporation’s failure to carry out the drain’s cleaning had created hurdles to the flow of the rainwater.

“As a result,” the meeting was told, “all this contributes to urban flooding during monsoon rains”.

In view of the situation, the meeting decided to construct the new 3.5km-long storm-water drain and rehabilitate the existing Mehran drain by removing illegal constructions and encroachments from its bed.

The chief secretary directed deputy commissioner of Malir to demolish illegal constructions and encroachments on Mehran drain and constituted a committee of officials drawn from irrigation department, KMC and cantonment boards to prepare a feasibility report and submit its PC-I within 30 days.

When the meeting was informed that K-Electric’s KDA grid station faced threat of flooding during last monsoon rains, the chief secretary asked the power company to formulate a plan for the protection of its installations and share the same with the Sindh government.

Shah directed the officers concerned to write a letter to the National Highway Authority, urging it to widen the culverts under the Motorway.

The deputy commissioner of the district concerned, representative of K-Electric, director general of Provincial Disaster Management Authority, officials of the irrigation department and the Army Engineering Corps attended the meeting.

Published in Dawn, January 31st, 2020

Opinion

Editorial

Fixing bond markets
Updated 01 Oct, 2026

Fixing bond markets

Pension funds, insurance companies, mutual funds, retail investors, and eventually, foreign investors must become bigger participants in the market.
Call centre rackets
01 Oct, 2026

Call centre rackets

A NUMBER of recent raids conducted by the authorities in different cities point to the growing threat fraudulent ...
Homeward bound
01 Oct, 2026

Homeward bound

FIVE months after Somali pirates captured an oil tanker carrying a 19-member multinational crew, Somali maritime...
Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...