Sealing of heritage site ordered

Published
1
SCAFFOLDING and protective netting has been installed on the Baweja Building ahead of construction work.—Fahim Siddiqi / White Star
SCAFFOLDING and protective netting has been installed on the Baweja Building ahead of construction work.—Fahim Siddiqi / White Star

KARACHI: Following the detection of illegal renovation and repair work on the Baweja Buil­ding, a protected heritage site, the Sindh Antiquities and Archaeology Depart­ment directed the Sindh Building Control Autho­rity (SBCA) on Thursday to seal the building.

The protected structure, located on Mir Kar­am Ali Talpur Road, Saddar, dates back to 1925 and showcases a striking Anglo-Mughal architectural style, featuring cupolas and large domes. Its stonework is richly deta­iled, with ornate arches and decorative motifs that catches the eye.

Originally constructed as a commercial office building, the Baweja House now houses a mix of serviced apartments, corporate offices and a small shopping mall on the lower floors.

Because of its historic character and well-preserved facade, it is listed as a heritage property (SD-P-192) in Karachi’s cultural heritage register.

Speaking to Dawn, Director General of the Antiquities and Archae­ology Department Abdul Fatah Shaikh said the owner/builder/contractor, Muhammad Asif Sultan, was issued a show-cause notice in October last year for carrying out unauthorised demolition work on the Baweja Building without obtaining prior permission from the department, in violation of the Sindh Cultural Heritage (Preservation) Act, 1994.

He said the owner/buil­der was asked to appear in the department in person and explain his position on October 13, 2025.

The DG said that the building owner did not appear; however, the demolition and renovation work was stopped. “Later, he was again directed to appear on November 14 last year, but he did not turn up,” he added.

Mr Shaikh said he had written to the SBCA, the deputy commissioner, the SSP of District South and the area SHO to take action against the illegal work at the building.

Under the provisions of the Act, no demolition, alte­ration or construction activity is permitted on or around a declared heritage building without prior app­r­oval from the Technical/Advisory Committee on Sindh Cultural Heritage.

The DG said he had writ­ten to the SBCA to ens­ure that the illegal dem­­ol­ition work was stop­ped immediately and that the building also be sealed.

He added that no construction work or development should be permitted on the building until a final decision is made by the technical committee.

It may be noted that the city’s architectural heritage remains at stake as unauthorised demolition and illegal constructions at colonial-era buildings and monuments continue despite checks.

Published in Dawn, January 16th, 2026

Opinion

Editorial

Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...
Terror and politics
Updated 29 Sep, 2026

Terror and politics

There is an urgent need to tone down the rhetoric and tackle terrorism as a collective challenge for both the affected provinces and the federation.
Watching the glaciers
29 Sep, 2026

Watching the glaciers

THE latest signs from Pakistan’s mountains are worrying. Suparco says the number of unfrozen glacial lakes it...
Dangerous agenda
29 Sep, 2026

Dangerous agenda

AS the world remains fixated on the US-Iran conflict, elsewhere in the Middle East, Israel is consolidating its grip...