GB people decry 22-hour-long power outages

Published
0
Gilgit: Residents of Kashrot area block the River Road during a protest against prolonged load-shedding.—Photo by the writer
Gilgit: Residents of Kashrot area block the River Road during a protest against prolonged load-shedding.—Photo by the writer

GILGIT: Protest demonstrations broke out across Gilgit-Baltistan on Thursday against prolonged electricity load-shedding, paralysing routine life in the region.

Most areas in the region have been enduring 22 hours of outages in a day for a long time. People of Kashrote Gilgit area, incl­uding women and children, took to streets aga­inst prolonged outages.

Enraged people, carrying banners inscribed with their demands, chanted slogans against the government. They blocked Park link road and burnt tyres.

Later, the protesters marched to the River Road near GB Chief Minister’s House, held a protest rally there and blocked the road. Vehicular traffic on River Road remained suspended for five hours because of the protest. The protesters said they have been experiencing 22 hours’ loadshedding daily which has paralysed their routine life.

Protesters block River Road near CM House for five hours

They said housewives could not cook food for their family members and children could not study as power outages have paralysed daily life of all people of the area.

The protesters said they are provided electricity for only two hours’ daily and this situation has made the people’s lives a mess.

The protesters said that VIP people are being provided electricity 24 hours daily through special power lines.

“There is no electricity in the general public area for 22 hours a day and no relevant authority is ready to take notice of this unbearable situation,” a resident of the area said.

He demanded of top officials of the department concerned to provide at least 10 hours’ electricity daily.

Residents of Hafeez­abad of Ghizer district also took to streets and blocked Ghizer-Shandur Road against the prolonged power outages.

A large number of local residents gathered at Ghizer-Shandur Road, staged a protest demonstration and blocked the road for several hours.

Protesters said residents remain without electricity for 22 hours daily causing them great inconvenience, but relevant authorities are not ready to end load-shedding.

Residents of Phakar village of Nagar district also came out on roads against power load-shedding in the area.

They said that residents of the area have been facing electricity outages on a daily basis, adding that despite spending billions of rupees, the government has failed to provide electricity to the people.

“Electricity is basic need of the people and depriving the people of this basic right is an injustice with the people,” they said.

Published in Dawn, February 16th, 2024

Opinion

Editorial

Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...
Terror and politics
Updated 29 Sep, 2026

Terror and politics

There is an urgent need to tone down the rhetoric and tackle terrorism as a collective challenge for both the affected provinces and the federation.
Watching the glaciers
29 Sep, 2026

Watching the glaciers

THE latest signs from Pakistan’s mountains are worrying. Suparco says the number of unfrozen glacial lakes it...
Dangerous agenda
29 Sep, 2026

Dangerous agenda

AS the world remains fixated on the US-Iran conflict, elsewhere in the Middle East, Israel is consolidating its grip...