ISLAMABAD: Internet services in Pakistan will remain slow until Saturday, as work to move traffic from a damaged submarine cable faces delays, Pakistan Tele­communication Com­pany Ltd (PTCL) said.

The Asia-Africa-Europe-1 (AAE-1) cable, one of the seven internet cables landing in Pakistan, developed a fault near Qatar on Thursday, leaving the country short of at least one terabits per second (tbps) bandwidth.

In case of such a fault, the traffic of the damaged cable is moved to other cables to ensure smooth internet.

However, the shifting of AAE-1 traffic to other submarine cables has been delayed by more than 36 hours.

PTCL says shifting traffic from damaged cable will take time

The AAE-1, with a capacity to deliver around 2.7 terabits per second of data, was being used for 1tbps traffic.

In a statement on Friday, PTCL, which is part of a consortium managing the AAE-1 cable, said repair teams were “diligently” working to resolve the issues.

A senior official of PTCL said the internet speed would become normal by Saturday night as the entire data of the faulty cable would be hooked with the SEA-ME-WE 4 (South East Asia–Middle East–Western Europe 4) and IMEWE (India-Middle East-Western Europe) cables also operated by PTCL.

“The delay in shifting the AAE-1 traffic to the other two systems was due to the slow technical response from international partners based in the Gulf region,” the official said.

He added that only 40 to 50pc of the cables’ total capacity is utilised to keep space for shifting data service in case of such emergencies.

The fault is unlikely to be fixed anytime soon as repair works on submarine cables can last for months.

The previous fault in the AAE-1 cable, which occurred in Pakistani territorial water in 2021, took almost 45 days to be repaired, a PTCL official previously said.

These faults take between 20 days to four months to get fixed depending upon the terrain and weather conditions of the area where the fault occurred and other factors.

“It can even take up to two days to detect the fault at the undersea cable and the repair work is carried out by highly trained personnel through specialised ships,” PTCL officials said in a recent media briefing.

Submarine cables are primarily damaged due to ship anchors’ dragging along the seabed, pressures from sea currents and erratic power supply.

The general misconception of sharks chewing on the cables was also dismissed by the officials.

The AAE-1 cable began operational in 2017, and it connects Vietnam, Singa­pore, Malaysia, Thailand, Pakistan, India, Oman, the United Arab Emirates, Qatar, Saudi Arabia, Egypt, Greece, Italy and France.

Published in Dawn, January 4th, 2025

Opinion

Editorial

Kashmir unresolved
Updated 30 Sep, 2026

Kashmir unresolved

The just solution lies in India addressing the issue through a trilateral dialogue involving the legitimate representatives of the Kashmiri people and Pakistan.
Water shortage
30 Sep, 2026

Water shortage

THAT the country is entering the Rabi season with an anticipated water shortage of nearly 25pc, the lowest carryover...
Young hearts
30 Sep, 2026

Young hearts

THE observance may have passed, but the message of World Heart Day should not fade with it. The occasion is a useful...
Terror and politics
Updated 29 Sep, 2026

Terror and politics

There is an urgent need to tone down the rhetoric and tackle terrorism as a collective challenge for both the affected provinces and the federation.
Watching the glaciers
29 Sep, 2026

Watching the glaciers

THE latest signs from Pakistan’s mountains are worrying. Suparco says the number of unfrozen glacial lakes it...
Dangerous agenda
29 Sep, 2026

Dangerous agenda

AS the world remains fixated on the US-Iran conflict, elsewhere in the Middle East, Israel is consolidating its grip...